Glory Hole (GH) — 22.04.2011
Whilst the world was madly having a fantastic time away from home in wildernesses all over Victoria we stayed lobe-side to get some equipment projects on the go. We had prepared all materials including the 40 gal drum of tomato puree…took us a while to get through that…with a deadline of Easter many a spag bog was had by all.
.)
…we made formers for the burner blocks and cast a trough along the base for those unfortunate accidents…
…the insulative lining of the GH was a combination of fibrefrax and fibre board…held in place by ceramic plugs.
…once the fibrefrax lined the inside, we cast a retaining wall (rim) of castible using various formers.
…the doors are layed out ready for castible…patterns left behind from the previous foundry continue to be invaluable.